Table of Contents
CIC Meeting
Winston Thomas
Winston-Thomas
Winston-Thomas.Facing southwest.Lagoon southwest corner showing drainage pipe
Winston-Thomas.Facing west.South berm containing ponded spring water.in southeast corner of lagoon
Lemon Lane Landfill
Lemon Lane Landfill.Extent of Excavation of Waste Exceeding 50 ppm PCBs
Illinois Central Spring
ICS.Facing east.Storage tanks in foreground;.work on building foundation
ICS.Facing northeast.Spring water receiving collection basin
ICS.Facing east.Closeup of foundation/flooring for treatment system
Neal’s Landfill
Neal’s Landfill
Neal’s Landfill
Neal’s Landfill.Facing east.Compacting north slope with roller
Neal’s Landfill.Facing north.Envirocon heat welding liner panels
Neal’s Landfill.Facing north.Piezometer PZ-1 with liner boot welded in place
Neal’s Landfill.Final Confirmation Sample Results
Neal’s Landfill
Neal’s Landfill
Bennett’s Dump
Bennett’s Dump
Bennett’s Dump.Results of Phase II Delineation Sampling.May 24 through June 2, 1999
Bennett’s Dump.Facing West.Severely stained soil and capacitors excavated from grid C13
Bennett’s Dump.Facing west.Capacitors and parts in Grid C-13
Bennett’s Dump.Facing west.TSCA material being loaded onto truck for off-site transport
Bennett’s Dump.Excavating northwest of grid cell D13 and north part of.C-13 to bedrock. Sampled clean grids in background
PPT Slide
|