CIC Meeting

Oct 5, 1999


Click here to start


Table of Contents

CIC Meeting

Winston Thomas

Winston-Thomas

Winston-Thomas.Facing southwest.Lagoon southwest corner showing drainage pipe

Winston-Thomas.Facing west.South berm containing ponded spring water.in southeast corner of lagoon

Lemon Lane Landfill

Lemon Lane Landfill.Extent of Excavation of Waste Exceeding 50 ppm PCBs

Illinois Central Spring

ICS.Facing east.Storage tanks in foreground;.work on building foundation

ICS.Facing northeast.Spring water receiving collection basin

ICS.Facing east.Closeup of foundation/flooring for treatment system

Neal’s Landfill

Neal’s Landfill

Neal’s Landfill

Neal’s Landfill.Facing east.Compacting north slope with roller

Neal’s Landfill.Facing north.Envirocon heat welding liner panels

Neal’s Landfill.Facing north.Piezometer PZ-1 with liner boot welded in place

Neal’s Landfill.Final Confirmation Sample Results

Neal’s Landfill

Neal’s Landfill

Bennett’s Dump

Bennett’s Dump

Bennett’s Dump.Results of Phase II Delineation Sampling.May 24 through June 2, 1999

Bennett’s Dump.Facing West.Severely stained soil and capacitors excavated from grid C13

Bennett’s Dump.Facing west.Capacitors and parts in Grid C-13

Bennett’s Dump.Facing west.TSCA material being loaded onto truck for off-site transport

Bennett’s Dump.Excavating northwest of grid cell D13 and north part of.C-13 to bedrock. Sampled clean grids in background

PPT Slide

Author: Government User