PCB News
Around the World
Court Assesses Only 10 Percent Share of Costs in Kalamazoo
River PCB Case
MICHIGAN ENVIRONMENTAL COMPLIANCE UPDATE
DECEMBER, 2002
SECTION: Volume 13, Issue 9
Honigman Miller Schwartz & Cohn, Brian Negele
The Kalamazoo River Study Group (KRSG), an association of four paper
companies, filed a contribution action under the federal Comprehensive
Environmental Response, Compensation, and Liability Act (CERCLA)
against Eaton Corporation in the U.S. District Court for the Western
District of Michigan for polychlorinated biphenyl (PCB) contamination
released into the river. As reported in the November 2001 edition of
Michigan Environmental Compliance Update, the court found Eaton liable
for PCB contamination released from two of its three automotive parts
manufacturing plants located along the river because the evidence
established that Eaton more likely than not had released PCB
contamination in the river from its plants located in Battle Creek and
Kalamazoo. The 2001 case, however, considered only the company's
liability under the CERCLA contribution claim.
The "allocation" phase of KRSG's contribution action was conducted in
a February 2002 trial in which the court determined the extent of
Eaton's liability for the PCB contamination in the Kalamazoo River.
The four paper companies sought a ruling that Eaton was liable for 40
percent of the $29,226,865.09 in past investigation costs as well as
40 percent of all future investigation and cleanup costs.
The court ruled that it was equitable to allocate Eaton only 10
percent of the costs of investigating a portion of the river upstream
of Morrow Lake and in the vicinity of the company's Battle Creek plant
which amounted to only $62,261.58.
Geography
The Kalamazoo River Superfund site consists of a 35-mile stretch of
the river listed on the National Priorities List (NPL). The upstream
end of the NPL site begins at the confluence of the Kalamazoo River
and Portage Creek downstream to the Allegan City Dam, plus three miles
of Portage Creek. Eaton's Kalamazoo plant was located three miles
downstream from the upstream end of the NPL site and was downstream of
three of the four KRSG members.
Under a 1990 administrative consent order with the Michigan Department
of Natural Resources, KRSG agreed to fund and conduct a remedial
investigation and feasibility study of a 95-mile stretch of the
Kalamazoo River, which also included the NPL-listed portion of the
river. Thus, included within the study area was Morrow Lake, created
by damming the river approximately five miles upstream of the NPL
site.
Eaton's Battle Creek plant, which was demolished in 1984, was located
approximately 15 miles further upstream of the Morrow Lake Dam and
therefore was located upstream of all four KRSG members.
Background
The court explained that the previous cases had established that the
PCBs found at the NPL site consisted primarily of Aroclors 1242, 1248,
1254, and 1260. KRSG acknowledged that its members were primarily
responsible for the majority of Aroclor 1242 present at the NPL site,
while Aroclors 1254 and 1260 account for only two to three percent of
the PCBs in the KRSG members' landfills.
In the Morrow Lake sediments, however, approximately 90 percent of the
PCBs are Aroclors 1254 and 1260, and those Aroclors account for
approximately 25 percent of the PCBs in the sediments of the Kalamazoo
River between Morrow Lake and the Allegan City Dam. KRSG therefore
argued that because of the difference between the proportion of
Aroclors 1254 and 1260 in the river and the landfills, the KRSG
members could not be responsible for the majority of those Aroclors at
the NPL site. KRSG argued that the evidence showed that the PCBs more
likely than not came from Eaton, while Eaton argued that the quantity
of any PCBs it contributed to the river was so small that it was
negligible.
The court acknowledged that because none of the parties were aware of
their disposal of PCBs, the court must rely on circumstantial evidence
to arrive at an allocation.
Battle Creek Plant
In the court's 2001 decision finding liability, it determined with
respect to Eaton's Battle Creek Plant that:
(*) the primary PCBs present were Aroclors 1248 and 1254;
(*) the PCBs weren't used in process oils but came from leaking
electrical equipment and hydraulic systems, which were normally closed
systems; and
(*) even if the PCBs from the leaks were absorbed by the floors or
swept up and discarded, some were probably contained in the facility's
effluent and made it from the ditch by which the plant discharged its
wastewater to the Kalamazoo River.
The court, however, noted that its determination of liability
regarding the Battle Creek plant was based on what was now known to be
erroneous testimony that the Clark Equipment Company did not discharge
process wastewater into the same ditch into which Eaton also
discharged.
After the liability stage of the trial, it was learned that Clark
discharged process wastewater into the ditch up until 1978. The
company manufactured industrial trucks, tractors, trailers, stackers,
and forklifts — operations that involved forging, machining, and
hard chrome plating. KRSG's expert conceded that based on the new
evidence, the PCBs present in the ditch could have come from Clark if
its effluent contained PCBs.
Although there was no direct evidence that Clark discharged PCBs
similar to Eaton's, Clark's plant had PCB-containing electrical
equipment. It also had approximately 30 hydraulic systems that could
have contained PCBs, and the forklifts it manufactured could have used
PCB-containing hydraulic fluids.
After the 2001 liability trial, KRSG's expert also collected a number
of new sediment samples from the ditch and the Kalamazoo River, the
results of which were extensively discussed by the court. Based on a
comparison of the PCB data relating to the ditch and PCB data from the
river at and downstream of Eaton's discharge, KRSG's expert opined
that the Battle Creek plant was among the most contaminated throughout
the river system and caused significant PCB contamination of the
river, including Morrow Lake and downstream through the NPL site.
KRSG argued that the court should revise its earlier findings and
conclude that Eaton used large quantities of PCB-containing process
oils. The paper companies further argued that given the significant
PCB contamination found in the ditch and the adjacent river, it was
reasonable to conclude that Eaton caused PCB contamination of a
magnitude similar to that caused by KRSG's members, which reached more
than 50 miles downstream of the members' facilities.
The court disagreed with KRSG's expert's conclusions on five bases:
(1) The court noted that it was impossible to know if the PCBs in the
ditch came from Eaton or Clark.
(2) The PCBs in the ditch didn't match those found at Eaton's Battle
Creek plant. As discussed above, the court previously found that
primarily Aroclor 1248 — with significant amounts of Aroclor 1254
— was used at the plant. Aroclor 1248 wasn't detected at all in the
ditch or river samples, and the Aroclors present in the sediments
didn't match those found in the Battle Creek plant's floor.
(3) The court pointed out that neither of the Aroclors found in the
PCB-containing hydraulic oil known to have been purchased by the plant
were found in the ditch.
(4) The court stated that KRSG's arguments ignored the other potential
sources of PCBs located upstream of Eaton's Battle Creek plant —
with 25 percent of the Kalamazoo River watershed being located
upstream of the plant. The court observed that the Aroclors identified
by KRSG in the vicinity of the Battle Creek plant were consistent with
the types found in electrical equipment such as transformers and
capacitors, which were commonly used in a variety of industries. The
court also pointed to data from 1972 showing the presence of Aroclor
1254 in the effluent of two other companies located in Battle Creek.
Another study in 1971 found that the most significant source of PCBs
to the Kalamazoo River upstream of Battle Creek was from the Battle
Creek River, which flows into the Kalamazoo River upstream of Eaton's
plant. The court noted that despite that evidence, KRSG's expert
didn't perform any testing upstream of Eaton's plant.
(5) The court stated that it ascribed little significance to KRSG's
expert's comparison of the ditch sediment samples to those taken from
the Kalamazoo River, observing that the ditch samples would naturally
be more concentrated because they had not been subject to the dilution
effects seen in the river due to greater flows and the addition of
clean sediment.
The court next summarized the testimony of Eaton's expert, which the
court found to be more persuasive than the testimony of KRSG's expert,
noting that Eaton's expert had more expertise in the areas of
hydrogeology and PCB transport in rivers and had recently testified
before a congressional subcommittee on contaminated sediment issues.
Eaton's expert testified that river sediment will normally show a
gradient in PCB concentration, with the highest concentrations near
the source and declining concentrations proceeding downstream from the
source.
Eaton's expert testified that if the Eaton Battle Creek plant was a
source of PCBs to the river, he would expect to see detectable
concentrations of PCBs in the 13-mile stretch of the river from the
plant to Morrow Lake, with a gradient of the highest concentrations
near Eaton's plant and declining concentrations proceeding downstream.
But that wasn't the case. A 1976 study found no Aroclor 1254 in the
sediments between the plant and Morrow Lake. Other data collected
between 1993 and 2000 from Battle Creek through the NPL site to Lake
Allegan also showed no declining gradient of PCB concentrations
starting at the Battle Creek plant.
Eaton's expert testified that the data appeared to indicate multiple
sources of Aroclor 1254 to the river and wasn't consistent with a
single or primary source of PCBs originating from Eaton's plant. The
expert said the evidence strongly supported that the PCBs found in
Morrow Lake originated from a source close to the lake, not 15 miles
upstream. Further, two other industrial facilities that discharged
into the lake were identified as possible sources of PCBs to the lake.
In addition, the Michigan Department of Environmental Quality (MDEQ)
project manager identified KRSG's members' landfills as potential
sources of windborne PCBs to the lake.
Eaton's expert admitted that some amount of PCBs from the company's
plant may have entered the ditch and traveled to Morrow Lake and also
over the Morrow Lake Dam and into the NPL site. But he opined that the
plant didn't release any measurable quantities of PCBs into the lake
or the NPL site.
The court concluded that KRSG had "provided no persuasive, credible,
or reliable new evidence which would undermine [the court's] previous
determination that any releases from Eaton's Battle Creek facility
were minimal." In fact, the new evidence that Clark discharged to the
ditch before 1978 further decreased the likelihood that the PCBs in
the ditch were attributable to Eaton.
The court found that the evidence supported the conclusion that
Eaton's Battle Creek plant was not a significant source of PCBs to the
NPL site that the PCBs contributed by the plant would not be
measurable above background levels.
Kalamazoo Plant
In explaining the 2001 finding that Eaton was liable for releasing
PCBs from its Kalamazoo plant into the river, the court noted that it
also found then that it was unlikely that any PCBs were used in an
open process at the plant. During the 2002 allocation trial, KRSG
presented new evidence of testing performed by MDEQ in 2001, which
detected Aroclors 1248 and 1260 at 3.2 and 2.1 parts per billion
(ppb), respectively, in a sample from a "product dispenser." The paper
companies also presented evidence that sampling in 1983 showed that
four of five press pits at the plant had total PCB levels of 12,000
ppb, 57,000 ppb, 94,000 ppb, and 880,000 ppb.
KRSG argued that MDEQ's detection of PCBs in a process oil 30 years
after PCBs were banned from such uses was significant. Eaton's expert,
however, argued that the single detection was so low as to not
indicate residual contamination and supported the conclusion that it
was related to isolated incidental contamination. KRSG argued that the
presence of PCBs in the press pits confirmed Eaton's use of
PCB-containing process oils.
The court rejected KRSG's arguments that this new evidence required
the court to conclude that Eaton widely used PCB-containing process
oils at its Kalamazoo plant. The new evidence did not address the
court's findings in the 2001 trial that the plant had no reasons to
use PCBs in its processes and that PCBs weren't present in the area
where metal chips were stored and process oils drained off them and
into the soils below. The court further stated that evidence of PCB
use in the plant wasn't significant if the PCBs didn't reach the
river. Accordingly, the court turned its attention to the data from
the Zantman Drain by which Eaton's Kalamazoo plant discharged
wastewater to the Kalamazoo River.
KRSG again presented evidence based on the additional testing it
performed in the Zantman Drain and the river after the 2001 liability
trial. The court stated that the drain was "a stagnant, slow moving,
organically rich ditch" that "would have been an excellent environment
for capturing PCBs that came down the Drain." But only Aroclor 1260
was detected in the drain. The court reasoned that if an assortment of
Aroclors were released into the drain, they should have been present
in the drain's sediments.
There was no evidence that the Zantman Drain was a significant source
of the other Aroclors present in the river. Therefore, the court
concluded that Eaton's Kalamazoo facility was not a significant source
of PCBs to the river.
Allocation of Response Costs
Section 113(f) of CERCLA, governing the allocation of response costs
under a contribution action, provides: "In resolving contribution
claims, the court may allocate response costs among liable parties
using such equitable factors as the court determines are appropriate."
The court recited the following nonexhaustive list of factors, known
as the "Gore factors," that courts have applied under Section 113(f):
(1) [T]he ability of the parties to demonstrate that their
contribution to a discharge, release or disposal of a hazardous waste
can be distinguished; (2) the amount of the hazardous waste involved;
(3) the degree of toxicity of the hazardous waste involved; (4) the
degree of involvement by the parties in the generation,
transportation, treatment, storage, or disposal of the hazardous
waste; (5) the degree of care exercised by the parties with respect to
the hazardous waste concerned, taking into account the characteristics
of such hazardous waste; and (6) the degree of cooperation by the
parties with the Federal, State or local officials to prevent any harm
to the public health or environment.
KRSG argued "that based on the three Gore Factors of volume of
discharge, toxicity, and cooperation with governmental authorities,
Eaton should be allocated 40 [percent] of the River investigation and
remediation costs [KRSG] has incurred and will incur in the future at
the Site." The court found, however, that the equities with regard to
cooperation with governmental agencies worked in the favor of neither
KRSG nor Eaton. Further, neither party was careful about the release
of wastes into the river. Therefore, the court said it would give no
weight to the cooperation factor.
Regarding the toxicity factor, KRSG argued that PCBs present in fish
were driving the sediment cleanup and that Aroclor 1254 accumulated in
fish four times more than the Aroclor 1242 released by KRSG's members.
The paper companies therefore argued that Aroclor 1254 is more toxic
than Aroclor 1242 and its discharge should be weighted more heavily.
The court noted that it had rejected that same argument in the 2000
case that KRSG filed against Rockwell International (see the January
2001 issue of Michigan Environmental Compliance Update, p. 1), and the
Sixth U.S. Circuit Court of Appeals (which covers Michigan) found no
error in the court's approach of treating all PCBs on an equal
toxicity basis. Therefore, the court ruled that because cooperation
and toxicity weren't relevant to the allocation in the case at hand,
the most relevant Gore factor was the volume of PCBs released to the
site by each party.
KRSG argued that Eaton should be liable for most of the PCB
contamination downstream of the company's Battle Creek plant to the
Morrow Lake Dam and for a significant portion of the Aroclor 1254 and
1260 contamination downstream of the dam. In addressing KRSG's
arguments, the court extensively analyzed the evidence presented by
both parties' experts. Regarding KRSG's contribution of Aroclors 1254
and 1260 to the river, the court found as follows:
The Court concludes that it is more likely than not that 2 to 5% is
representative of the KRSG's discharges of Aroclors 1254 and 1260 to
the River. Thus, most of the Aroclors 1254 and 1260 in the Kalamazoo
River . . . between Morrow Lake and Lake Allegan had to have come from
sources other than [KRSG]. The Court agrees with [KRSG] that because
Aroclors 1254 and 1260 are not associated with paper wastes and
because they are not found in the [landfills] in any significant
ratio, much of the PCB Aroclors 1254 and 1260 now present in sediments
between Morrow Lake Dam and Lake Allegan Dam is attributable to
sources other than [KRSG's] members' papermaking operations.
The court again noted that KRSG's failure to do any testing upstream
of Eaton's Battle Creek plant prevented it from showing by a
preponderance of the evidence that Eaton was the source of the PCBs in
Morrow Lake as opposed to sources farther upstream. Further, there was
no gradient of PCBs going downstream from the Battle Creek plant.
The court also concluded that Morrow Lake was not a significant source
of PCBs to the NPL site. If it had been, the court stated that one
would expect to find a gradient of Aroclor 1254 declining downstream
of the Morrow Lake Dam. Instead, the evidence showed a multiple source
pattern for Aroclor 1254 within the NPL site. The court further noted
that MDEQ had not expressed an interest in remediating Morrow Lake and
the river upstream. The court ruled as follows:
Because this Court finds that Eaton's Battle Creek facility was not a
significant source of PCBs to Morrow Lake, and because this Court now
concludes that Morrow Lake was not a significant source of PCBs to the
NPL Site, Eaton Battle Creek's facility [sic], which is upstream of
Morrow Lake, is an even less significant contributor of PCBs to the
NPL Site.
Based upon the finding contained in this opinion and all of the
previous opinions in this case, this Court concludes that the
[Aroclor] 1254 in the NPL Site came from multiple sources. Eaton was
one of those many sources. So were [KRSG's] members.
The court stated that it assumed that every industry along the
Kalamazoo River was a possible source of a small amount of Aroclor
1254 to the NPL site. The court found insufficient evidence, however,
for singling out Eaton as a significant source. It therefore found the
company's contribution to be "very minimal."
The court ruled that it would not be equitable to require Eaton to
participate in the high cost of remediating the NPL site because:
(*) Eaton was not a significant source of Aroclor 1254 to the NPL
site;
(*) small quantities of Aroclor 1254 were contributed by a large
number of industries; and
(*) the total amount of Aroclor 1254 would not have required
remediation but for the large amount of Aroclor 1242 discharged by
KRSG's members — that is, the PCBs contributed by Eaton did not
affect the scope of or need for a cleanup.
Despite that holding, however, the court ruled that Eaton should be
required to pay some portion of the cost of the investigation
performed upstream of Morrow Lake. Based on the discovery of PCBs at
the company's Battle Creek plant and in Morrow Lake, its lack of any
historical records, and the presence of Aroclor 1254 beyond what could
be attributed to KRSG's members, both parties had an interest in
determining the amount of PCBs that Eaton contributed to the Kalamazoo
River. The court thus concluded that Eaton had reaped the benefits of
the investigation conducted by KRSG and ruled that it would be
equitable to require the company to bear 10 percent of the costs of
investigating the river upstream of Morrow Lake and in the vicinity of
its Battle Creek plant.
With respect to the costs of KRSG's investigation of the Kalamazoo
River downstream of Morrow Lake, however, the court concluded that the
paper companies would have incurred those costs regardless of Eaton's
involvement as a potential source. Therefore, the court ruled that
Eaton should bear none of the investigation costs incurred within the
NPL site.
Consequently, the court ruled that Eaton must pay KRSG $ 62,261.58,
plus prejudgment interest as provided under CERCLA § 107(a), for
its share of the investigation costs.
Kalamazoo River Study Group v. Eaton Corporation, No. 1:95-CV-838
(W.D. Mich. August 29, 2002). Copyright 2002 Honigman Miller Schwartz
& Cohn
|