Dan Hopkins presented the Consent Decree Parties' Schedule as filed with the Court. He noted the overlapping timelines of the work on the various sites, and stated the two sites now being investigated are Winston Thomas and Lemon Lane Landfill.
John Langley went over the land use scenerios for both Winston Thomas and Lemon Lane. The most likely future land use for the two sites are as business parks, and in the case of Winston Thomas, possibly a commercial shopping area. Mr. Langley was quick to point out that no zoning or executive decisions had been made towards this end.
Dan Hopkins presented information about Winston Thomas and Lemon Lane. As to Winston Thomas he stated that a sampling plan was needed to detirmine what remediations are necessary. A risk asessment is needed, and so ground water and well water need to be studied. At Lemon Lane extensive well water tests have been done that indicate little seepage into the wells near Lemon Lane. The problem seems to be concentrated at the Illinois Central Springs, where in high flow periods, large amounts of PCBs are flushed from the system, and drain into Clear Creek. The catchment area around the IC Springs needs study so that a way to reduce the peaks of flow during heavy rainfall can be investigated, making the job of treating this water feasable. Hot spot remediation and capping is the only method of dealing with the landfill material currently being considered.
Dottie Alkie from Wesinghouse talked about how the screening of possible alternative methods is to be accomplished. First she listed all the possiblities for remediation. These were:
She presented the steps involved in screening alternatives to be used in the remediation of Lemon Lane and Winston Thomas.
A. Effectiveness-
C. Administrative Considerations
Three sheets were handed out, one a map of the Lemon Lane area, one of Wintson Thomas, and the Schedule for cleanup of the sites. I have placed these on the COPA BBS as ll.gif (Lemon Lane map), wt.gif (Wintston Thomas map) and sched.gif (CDP Cleanup Schedule). The schedule is a very large graphic file (400K), download it when you have plenty of time! (I will try to copy this into a text file soon - Mitch) At the meeting COPA delivered a letter to the EPA asking for an RI/FS. Here is the EPA's rationale (from 1990) for the lack of an RIFS.